ESTIMATES · FREE · CONSTRUCTION
A free construction estimate generator with a sample new-build estimate you can overwrite line by line.
A building construction estimate template splits a new build into phases: permits, site work, foundation, framing, roof, rough-ins, drywall and finish. Price framing by the square foot, add allowances for items the owner picks, and download the construction estimate template free as a PDF or Word file.
No signup, no watermark. Nothing is uploaded: the estimate, and your logo, stay in your browser.
Live preview
ESTIMATE
Prepared for
Project
Scope of work
All amounts in Canadian dollars (CAD).
Terms and notes
Acceptance
By signing below, you accept this estimate and the terms above.
Accepted by (print name)
Signature
Date
This template is a convenience, not legal or tax advice. Example prices are examples; use your own costs.
These are the lines the generator loads for construction. The numbers are example numbers to show how each line is built, not prices to charge. Replace every quantity and price with your own.
| Item | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|
| Permits, plan review and utility connection fees | lump sum | 1 | 3,200.00 | 3,200.00 |
| Site clearing, excavation and grading | lump sum | 1 | 6,500.00 | 6,500.00 |
| Foundation: footings, stem walls and slab | lump sum | 1 | 21,000.00 | 21,000.00 |
| Framing labor, walls, floor and roof structure | sq ft | 1800 | 14.00 | 25,200.00 |
| Framing lumber, sheathing and trusses | allowance | 1 | 24,000.00 | 24,000.00 |
| Roofing, windows and exterior doors | allowance | 1 | 27,000.00 | 27,000.00 |
| Electrical rough-in and finish (subcontractor) | lump sum | 1 | 14,500.00 | 14,500.00 |
| Plumbing rough-in and fixtures (subcontractor) | lump sum | 1 | 13,500.00 | 13,500.00 |
| HVAC system installed (subcontractor) | lump sum | 1 | 11,500.00 | 11,500.00 |
| Insulation, drywall hang, tape and finish | sq ft | 1800 | 4.50 | 8,100.00 |
| Interior trim, doors, cabinets and paint | allowance | 1 | 26,000.00 | 26,000.00 |
| Final cleanup and punch list | lump sum | 1 | 900.00 | 900.00 |
| Example subtotal | $181,400.00 | |||
A building construction estimate should show the plans it is based on, the square footage, each phase priced on its own line, allowances for owner-selected items, what the permit fees cover, the contingency, a start and finish window, the payment schedule and a clear list of exclusions.
Builders price a new home three common ways: a price per square foot for a quick range, a phase-by-phase estimate with allowances for a real bid, or cost-plus with a fee. The phase estimate is the one clients can compare, so each phase gets its own line.
Write these on the estimate before the job starts. A surprise is easier to bill when the client has already read about it and signed.
A new build needs building permits and usually separate electrical, plumbing and mechanical permits plus inspections at set stages, such as footing, framing and final. Requirements differ by city and county, so confirm with the local building department and write on the estimate who applies and who pays. This is general guidance, not legal advice.
Trades that often work on the same jobs as builders:
All trades: free estimate template for any trade, then roofing, landscaping, painting, fence, cleaning, snow removal, plumbing, electrical, remodeling, handyman, hvac, drywall.
When the work is done, send the bill with the contractor invoice template.
An estimate is your calculated price for the work. A bid is that price submitted formally, often against other builders, with the terms the owner can accept. Many builders use the same document for both and add a valid-until date.
List each allowance as its own line with a dollar amount and the item it covers, such as flooring at a set amount per square foot. Add a sentence saying that anything above the allowance is billed as a change order.
Many builders add a contingency line for the unknowns they cannot see yet, such as ground conditions. Show it as its own line and say it is only used with the owner's written approval.
Yes. The preset is a sample new-build estimate with example numbers. Overwrite the quantities and prices with your own, delete lines you do not need, and add the phases your job has.
Yes. It is free to use, with no signup and no watermark, and you can download it as a PDF or a Word file. Nothing you type is uploaded: the construction estimate is built in your browser.