A free remodel estimate generator preloaded with a sample kitchen remodel, allowances and contingency.
A remodeling estimate template breaks a remodel into demo, framing, rough-ins, drywall, finishes and cleanup, with allowances for cabinets, counters and fixtures the owner picks. Fill in the rooms and your costs, and download the home remodel estimate as a PDF or Word file.
No signup, no watermark. Nothing is uploaded: the estimate, and your logo, stay in your browser.
Live preview
ESTIMATE
Prepared for
Project
Scope of work
All amounts in Canadian dollars (CAD).
Terms and notes
Acceptance
By signing below, you accept this estimate and the terms above.
Accepted by (print name)
Signature
Date
This template is a convenience, not legal or tax advice. Example prices are examples; use your own costs.
These are the lines the generator loads for remodeling. The numbers are example numbers to show how each line is built, not prices to charge. Replace every quantity and price with your own.
| Item | Unit | Qty | Unit price | Amount |
|---|---|---|---|---|
| Demolition and haul-away | lump sum | 1 | 2,400.00 | 2,400.00 |
| Framing and blocking changes | lump sum | 1 | 3,200.00 | 3,200.00 |
| Plumbing changes (subcontractor) | lump sum | 1 | 2,800.00 | 2,800.00 |
| Electrical changes and new circuits (subcontractor) | lump sum | 1 | 3,100.00 | 3,100.00 |
| Insulation and drywall, finished | sq ft | 420 | 4.25 | 1,785.00 |
| Flooring installation, labor | sq ft | 220 | 5.00 | 1,100.00 |
| Cabinets, delivered | allowance | 1 | 9,500.00 | 9,500.00 |
| Countertops, templated and installed | allowance | 1 | 4,800.00 | 4,800.00 |
| Tile backsplash, labor | sq ft | 40 | 14.00 | 560.00 |
| Interior painting | lump sum | 1 | 1,600.00 | 1,600.00 |
| Fixtures and hardware | allowance | 1 | 2,200.00 | 2,200.00 |
| Permits and project cleanup | lump sum | 1 | 650.00 | 650.00 |
| Contingency, used only with written approval | allowance | 1 | 2,500.00 | 2,500.00 |
| Example subtotal | $36,195.00 | |||
A remodeling estimate should list the demo, each trade's work, the finish materials, allowances with their dollar amounts, the permit, a separate contingency, the schedule, the payment draws and the list of items the price does not cover.
Remodelers price a remodel as a fixed price from a scope of work, with allowances for items the owner has not chosen yet, or as cost plus a fee. A fixed price needs a tight scope; cost plus needs a regular report of actual costs.
Write these on the estimate before the job starts. A surprise is easier to bill when the client has already read about it and signed.
Remodels that change structure, plumbing, electrical or mechanical systems usually need permits and inspections. Rules differ by city and county, and some jobs also need plans stamped by a designer or engineer, so confirm with the building department. This is general guidance, not legal advice.
Trades that often work on the same jobs as remodelers:
All trades: free estimate template for any trade, then construction, roofing, landscaping, painting, fence, cleaning, snow removal, plumbing, electrical, handyman, hvac, drywall.
When the work is done, send the bill with the contractor invoice template.
An estimate is your priced scope. A bid is that estimate submitted for the owner to accept, often against other contractors. Most remodelers send one document with a valid-until date and a signature line.
Give each allowance its own line with a dollar amount and describe the item, such as tile at a set price per square foot. State that overages are a change order and savings go back to the client.
A lot of remodelers add a contingency line for unknowns behind walls. Show it separately, say how it is used, and have the client approve each use in writing.
Many remodelers take a deposit, then draws at stages such as demo, rough-in and finish, with a final payment at completion. Write the schedule on the estimate and match it to your cash needs.
Yes. It is free to use, with no signup and no watermark, and you can download it as a PDF or a Word file. Nothing you type is uploaded: the remodeling estimate is built in your browser.